Related News

Archaeologists have deciphered a 1,700-year-old inscription at an ancient Roman temple in Turkey that offers rare written evidence of the shift from Mithraism to Christianity during the Roman period.The inscription

Photographic view during the Static Test of SOLVE-ST01 NEW DELHI: The Indian Space Research Organisation (ISRO) has successfully conducted the first ground test of the solid motor for its Sub-Orbital

Astronomers have detected light from a tiny but powerful galaxy that existed when the universe was still emerging from a vast fog of hydrogen gas. The discovery, made using the

Photo credit: PIB NEW DELHI: Indian Railways has approved running India’s first indigenous hydrogen fuel-cell-based train on the Jind-Sonipat section of the Northern Railway, entering the elite club of nations

The National Science Foundation on Thursday reversed a decision to dismantle a sprawling ocean monitoring network after vigorous objections from Democratic lawmakers and scientists who rely on it to track

Isro chairman V Narayanan (Right) NEW DELHI: Isro chairman V Narayanan has revealed that the space agency is collaborating with the Department of Atomic Energy (DAE) to develop an advanced

Trending News

In today’s digital age, the opportunity to make money online without any initial investment is more accessible than ever before. Whether you’re a student looking to earn some pocket money,

In today’s digital world, make money online has become a dream many want to turn into reality. Whether you’re looking for a side hustle or aiming to build a full-time

JSW Cement, the building materials arm of Sajjan Jindal-led JSW Group, has reduced the size of its upcoming initial public offering (IPO) to Rs 3,600 crore and will open the

The agricultural Gross Value Added (GVA) growth is expected to moderate to 4.5% in the first quarter of FY26, down from 5.4% in the preceding quarter, according to a report

Foreign portfolio investors (FPIs) turned net sellers in the Indian equity market in July, pulling out Rs 17,741 crore amid rising global trade tensions. According to data from NSDL, this

Avenue Capital Group-backed Asset Reconstruction Company (India) Ltd (ARCIL) has filed its draft red herring prospectus (DRHP) with markets regulator Sebi on Friday to raise funds through an initial public

Almost as long as a football field: What to know about Nasa’s Artemis II rocket and mission

Word Count: 362 | Estimated Reading Time: 2 minutes


Almost as long as a football field: What to know about Nasa's Artemis II rocket and mission

If you laid Nasa’s Artemis II moon rocket on its side, it would stretch nearly the length of a football field. That’s because the Space Launch System (SLS) stands 322 feet tall — just a few yards shy of the 360-foot length of a standard gridiron, making it one of the tallest rockets ever built.The Artemis II rocket is bigger than many landmarks on Earth. If placed end-to-end with the International Space Station, which spans about 357 feet including solar arrays, the two would be nearly the same length as a football field including both end zones.Built to carry astronauts beyond low-Earth orbit, the Artemis II rocket is designed to send four crew members on a 10-day journey around the moon and back. The mission will include three Nasa astronauts and one from Canada and will test the Orion spacecraft’s life support systems ahead of a future lunar landing.The massive rocket was slowly rolled from Nasa’s Vehicle Assembly Building to Launch Pad 39B at Kennedy Space Center earlier this year, a journey that took nearly 12 hours. Moving at about 1 mile per hour atop a crawler transporter, the SLS towered over the historic launch complex.Nasa had hoped Artemis II could launch as early as February, marking the first time humans would travel beyond low-Earth orbit since the Apollo missions more than 50 years ago. The agency has since announced the launch will not be attempted until at least March.The delay followed a failed countdown rehearsal at the launch pad. The test did not include astronauts, and the rocket’s engines were not scheduled to ignite. During fueling, hydrogen leaks were detected — an issue that also delayed the uncrewed Artemis I mission before it successfully orbited the moon in 2022.Despite efforts to continue the rehearsal, including fully fueling the rocket and entering the final minutes of the countdown, the hydrogen leak returned. The test was ultimately scrubbed shortly after midnight with about five minutes remaining.Nasa has described Artemis II as a crucial step toward returning humans to lunar orbit and paving the way for a future mission that will land astronauts on the moon.



Source link