Saturday, August 2, 2025

Creating liberating content

Avenue Capital Group-backed Asset Reconstruction Company (India) Ltd (ARCIL) has

Related News

Avenue Capital Group-backed Asset Reconstruction Company (India) Ltd (ARCIL) has filed its draft red herring prospectus (DRHP) with markets regulator Sebi on Friday to raise funds through an initial public

Brent crude prices could climb to $80 per barrel in the coming months amid escalating tensions between the United States and Russia, predicts oil market analysts. The forecast came after

Russia-backed Nayara Energy looks at India’s state-run oil companies to offload petrol, diesel exports Nayara Energy has approached Indian state-run oil marketing companies (OMCs) to offload its export volumes of

Volvo Cars India has revised its earlier strategy of transitioning to an all-electric portfolio, opting instead to continue selling both electric and internal combustion engine (ICE) vehicles in the country.

US President Donald Trump on Saturday claimed that he had “heard” reports of India halting Russian oil imports, hailing it as a “good step”. “I understand that India is no

NEW DELHI: On a day when US notified additional levies for countries, with 25% imposed on Indian exports, govt hardened its position asserting that farm and dairy products, genetically modified

Trending News

Avenue Capital Group-backed Asset Reconstruction Company (India) Ltd (ARCIL) has filed its draft red herring prospectus (DRHP) with markets regulator Sebi on Friday to raise funds through an initial public

Russia-backed Nayara Energy looks at India’s state-run oil companies to offload petrol, diesel exports Nayara Energy has approached Indian state-run oil marketing companies (OMCs) to offload its export volumes of

US President Donald Trump on Saturday claimed that he had “heard” reports of India halting Russian oil imports, hailing it as a “good step”. “I understand that India is no

Ever since President Trump began raising tariffs on goods from China during his first term, Chinese companies have raced to set up warehouses and factories in Southeast Asia, Mexico and

New Delhi: Goods and services tax (GST) collections rose 7.5% to Rs 1,95,735 crore in July, showing signs of a pick-up from the previous month, although the growth was slower

Mumbai: UPI transactions reached a new peak in July 2025, with a record 1,947 crore transactions worth nearly Rs 25.1 lakh crore. This marked a 35% year-on-year growth in transaction

‘Mission could not be accomplished’: What Isro chief said after EOS-09 setback

Word Count: 607 | Estimated Reading Time: 4 minutes


'Mission could not be accomplished': What Isro chief said after EOS-09 setback
Isro chairman V Narayanan (Pic credit: PTI)

NEW DELHI: The Indian Space Research Organisation (Isro) on Sunday faced a setback after the launch of Earth Observation Satellite, EOS-09, failed due to a technical anomaly during the third stage of the PSLV-C61 rocket flight. Isro chairman V Narayanan confirmed the issue during a post-launch address to scientists, saying that the mission could not be completed as planned.“During the functioning of the third stage, we are seeing an observation and the mission could not be accomplished. After analysis, we shall come back,” Narayanan said. Isro also acknowledged the failure in a post on X, saying, “Today 101st launch was attempted, PSLV-C61 performance was normal till 2nd stage. Due to an observation in 3rd stage, the mission could not be accomplished.”The PSLV-C61 launch sequence includes multiple complex stages, beginning with the ignition of the PS1 and strap-on motors, followed by stage separations and eventual deployment of the payload. The third stage, a solid rocket motor with a maximum thrust of 240 kilonewtons, is responsible for delivering high thrust after the rocket exits the atmospheric phase. It was at this critical juncture that the problem occurred.The EOS-09, an advanced Earth observation satellite, was intended to be placed in a Sun Synchronous Polar Orbit (SSPO). Designed with C-band synthetic aperture radar, it was capable of capturing high-resolution images regardless of weather conditions, day or night.In addition to its surveillance capabilities, the mission underscored Isro’s commitment to sustainability in space. EOS-09 was equipped with deorbiting fuel, enabling responsible end-of-life disposal. The PSLV-C61 mission plan also included passivation of the fourth stage to reduce orbital debris, aligning with global efforts for cleaner space operations.





Source link

Most Popular Articles

Sign In

Welcome ! Log into Your Account