Monday, June 23, 2025

Creating liberating content

High cholesterol levels are a silent threat that can increase

US stock markets inched up on Monday, showing little immediate

An Atlas V rocket of United Launch Alliance (ULA) lifts

Related News

ITR filing: The deadline to file income tax returns has been extended to September 15, 2025 this year, as against July 31 every year. (AI image) ITR filing FY 2024-25:

High cholesterol levels are a silent threat that can increase the risk of heart disease, including a heart attack and stroke. This condition occurs when you have an excess of

US stock markets inched up on Monday, showing little immediate reaction to the ongoing Middle East conflict, including fresh US-led airstrikes on Iran over the weekend.Wall Street traded in green

An Atlas V rocket of United Launch Alliance (ULA) lifts off from Space Launch Complex 41 at the Kennedy Space Center in Cape Canaveral, Florida on June 23, 2025. Gregg

A Tesla Inc. robotaxi on Oltorf Street in Austin, Texas, US, on Sunday, June 22, 2025. T Tim Goessman | Bloomberg | Getty Images Tesla‘s driverless robotaxi finally hit the

Optical illusions have recently sent the internet into a tizzy, as they get our brain to exercise, and can be the perfect test of our observational skills and keen eye.

Trending News

ITR filing: The deadline to file income tax returns has been extended to September 15, 2025 this year, as against July 31 every year. (AI image) ITR filing FY 2024-25:

US stock markets inched up on Monday, showing little immediate reaction to the ongoing Middle East conflict, including fresh US-led airstrikes on Iran over the weekend.Wall Street traded in green

India’s private sector activity showed strong momentum in June, reaching its fastest pace in over a year, as firms ramped up production to meet booming domestic and international demand. These

Basmati rice exports: The cargo remains stationed at Gujarat’s Kandla and Mundra ports. (AI image) Israel-Iran conflict impact: Approximately 1,00,000 tonnes of basmati rice bound for Iran remain stuck at

The national payments corporation of India, NPCI, has introduced a new facility for real-time PAN and bank account validation on the Income Tax department’s e-filing website. Announced in a circular

Indian Army places order of 450 NAGASTRA-1R loitering munitions from SDAL (Image credits: ANI) The Indian Army placed an order with solar defence and aerospace limited, SDAL, for approximately 450

Delhi-Meerut RRTS: Namo Bharat trains complete trial run in less than an hour at 160 kmph speed; full 82-km corridor to open soon

Word Count: 659 | Estimated Reading Time: 4 minutes


Delhi-Meerut RRTS: Namo Bharat trains complete trial run in less than an hour at 160 kmph speed; full 82-km corridor to open soon
Trial run of the Namo Bharat trains (Image credits: PTI)

Delhi-Meerut RRTS: Soon you may be able to zip between Delhi and Meerut in just an hour at 160 kmph on Namo Bharat trains. The National Capital Region Transport Corporation (NCRTC) has successfully completed the scheduled trial run of Namo Bharat trains on Sunday, covering the entire 82-km corridor from Sarai Kale Khan in Delhi to Modipuram in Meerut. The trains completed the journey in under an hour while halting at all stations, marking a major operational milestone in India’s first Regional Rapid Transit System (RRTS).“This marks a significant operational milestone in the implementation of India’s first Namo Bharat corridor, connecting Delhi, Ghaziabad, and Meerut,” NCRTC said in a statement.During the trial, Namo Bharat trains ran at their maximum operational speed of 160 km per hour. Meerut Metro trains also ran parallel to the train, with both systems completing their respective trials smoothly. Officials highlighted that this is the first time in India that local metro services are being operated on shared infrastructure with high-speed regional trains.Delhi-Meerut RRTS:Currently, a 55-km stretch with 11 stations is open to the public. Work is ongoing on the remaining 4.5 km in Delhi (between Sarai Kale Khan and New Ashok Nagar) and a 23-km section in Meerut (between Meerut South and Modipuram). The Meerut segment includes the Meerut Metro, which features 13 stations—18 km elevated and 5 km underground.A key highlight of the corridor is the deployment of the ETCS Level 3 hybrid signalling system over an LTE backbone, the first such implementation in the world. This advanced signalling system has been integrated with platform screen doors (PSDs) at every station and performed without fault during the trial, according to NCRTC.The successful full-corridor trial is seen as a crucial step toward full commissioning of the Namo Bharat corridor, enhancing connectivity across the National Capital Region.





Source link

Sign In

Welcome ! Log into Your Account