Tuesday, July 1, 2025

Creating liberating content

New Delhi: The commerce department is seeking to amend the

Mumbai: B2B startup Jumbotail raised a fresh $120 million in

New Delhi: Airtel’s request for conversion of its statutory dues

New Delhi: The ninth year of the Goods and Services

Related News

New Delhi: The commerce department is seeking to amend the law governing special economic zones (SEZs), offering several concessions as it seeks to revive the enclaves to boost exports and

Mumbai: B2B startup Jumbotail raised a fresh $120 million in funding from investors led by SC Ventures, the investment arm of Standard Chartered, at a valuation of $1 billion, sources

New Delhi: Airtel’s request for conversion of its statutory dues into equity – on the lines of a bailout given to Vodafone Idea – may not be approved by the

New Delhi: The ninth year of the Goods and Services Tax (GST), which begins on Tuesday, could actually see the much-awaited rationalisation of the rates, although the shrinking of slabs

New Delhi: Industrial output growth slowed to a nine-month low in May as electricity and mining sectors contracted sharply and the key manufacturing sector remained sluggish. This points to some

Stocks are wrapping up a stellar quarter at all-time highs amid signs of progress in US trade talks while hopes the Federal Reserve will resume its rate cuts drove Treasuries

Trending News

Mumbai: B2B startup Jumbotail raised a fresh $120 million in funding from investors led by SC Ventures, the investment arm of Standard Chartered, at a valuation of $1 billion, sources

New Delhi: The ninth year of the Goods and Services Tax (GST), which begins on Tuesday, could actually see the much-awaited rationalisation of the rates, although the shrinking of slabs

Stocks are wrapping up a stellar quarter at all-time highs amid signs of progress in US trade talks while hopes the Federal Reserve will resume its rate cuts drove Treasuries

New Delhi: The govt has raised the price of natural gas from state-run ONGC and Oil India Ltd’s legacy fields to $6.89 per unit (million British thermal units) for July

NEW DELHI: A total of 10 initial public offerings (IPOs) are set to open for subscription between June 30 and July 4, including two mainboard IPOs and eight SME listings,

NEW DELHI: The government has raised the price of natural gas from state-run ONGC and Oil India Ltd’s legacy fields to $6.89 per unit (million British thermal units) for July

Uttar Pradesh: CM Adityanath inspects Ganga Expressway progress, says will be ready by November

Word Count: 682 | Estimated Reading Time: 4 minutes


Uttar Pradesh: CM Adityanath inspects Ganga Expressway progress, says will be ready by November

SHAHJAHANPUR: Uttar Pradesh chief minister Yogi Adityanath on Sunday inspected the Ganga Expressway stating that the entire project will be completed by November this year.
The ambitious infrastructure project aims to connect the western and eastern parts of the State and stretches approximately 600 kilometers from Meerut to Prayagraj.
Chief Minister Yogi Adityanath said, “This is one of the longest expressways in the country… The entire work of the Ganga Expressway has to be completed by November… It holds the ability to land any fighter or commercial aircraft…”
Chief Minister Adityanath also inspected the construction work of the Ganga Expressway in Hardoi.
The Ganga Expressway with a proposed length of 594 kilometres. Ganga Expressway is the second in terms of length in the country after the longest, the Mumbai-Nagpur Expressway.
Uttar Pradesh currently has four expressways that feature among the top 10 expressways in terms of length in India. Once the Ganga Expressway becomes operational, the state will have five of the top 10 expressways in the country. This expressway will connect the state from east to west through 518 villages in 12 districts.
After the expressway opens, the distance from Meerut to Prayagraj via Hapur, Bulandshahr, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Rae Bareli, and Pratapgarh will be covered in just a few hours. The Ganga Expressway will start from Bijauli village on Meerut-Bulandshahr (NH 334) and end near Judapur Dadu village on (NH 19) in Prayagraj.
The expressway is being built on 7467 hectares of land at an estimated cost of Rs 36,230 crore.
Big planes will be able to land, two long bridges will be built on the Ganga and Ramganga.
The Ganga Expressway will initially have six lanes, with a proposal to expand it to eight lanes later. Its design allows for a speed of 120 kilometres per hour.
Nine public amenities complexes will be developed along the expressway at various locations for public convenience. Two main toll plazas (Meerut and Prayagraj) are planned, while ramp toll plazas are proposed at 15 locations.
Additionally, two large bridges will be built over the Ganga River (960 meters) and the Ramganga River (720 meters). Furthermore, a 3.50-kilometre-long airstrip will be constructed near the Jalalabad tehsil in Shahjahanpur.





Source link

Most Popular Articles

Sign In

Welcome ! Log into Your Account